08:00 – 09:00 |
Registration |
|
|
09:00 – 09:15 |
Introduction to the Symposium |
|
|
09:15 – 09:55 |
Opening lecture: Above, below and beyond the mobility transformation in Graz |
Fallast, K. |
|
|
|
|
|
Section 1 |
S-LINK, Salzburg |
|
|
09:55 - 10:20 |
S-LINK Salzburg gains momentum |
Greinmeister, A. |
|
10:20 - 10:45 |
The soil investigations and soil mechanics insights for the underground construction of the S-LINK |
Saurer, E.; Greinmeister, A. |
|
10:45 - 11:10 |
S-LINK - tunnel construction in the city centre of Salzburg, challenges and solutions |
Jedlitschka, G.; Kohlböck, B.; Eder, M.; Greinmeister, A. |
|
|
|
||
11:10 - 11:40 |
Coffee break |
||
|
|
||
Section 2 |
International Projects I |
||
11:40 - 12:05 |
Using various geotechnical techniques for challenging conditions at the WestLink project |
Raja, S. U.; Landergren, H.; Thurner, R. |
|
12:05 - 12:30 |
Grand Paris Express - a shallow urban tunnel with conventional method - a case study from Line 15 South |
Cavagnet, S.; Mancinelli, L.; Midali, E.; Diallo, I. |
|
12:30 - 12:55 |
Use of fiber-reinforced segments and cement-reduced annular gap mortar on the Grand Paris Express project |
Khatchadourian, A.; Heim, A. |
|
|
|
||
12:55 - 14:25 |
Lunch break |
||
|
|
||
Section 3 |
Tunnelling Specifics of Metro/Subways |
||
14:25 - 14:50 |
Model-based representation of geological prognosis (un)reliability for shallow tunnels |
Massimo-Kaiser, I.; Salzgeber, H.; Flora, M. |
|
14:50 - 15:15 |
Line crossing U2xU5 construction sections U2/17 to U2/21 - experience gained to date from tunnel excavation works |
Schweiger, H.; Wäger, R. |
|
|
|||
15:15 - 15:45 |
Coffee break |
||
|
|
||
Section 4 |
International Projects II |
||
15:45 - 16:10 |
Assessing potential building damage caused by leakage to urban tunnels |
Langford, J.; Ritter, S.; Lysdahl A. K.; Ånes, E. W.; Piciullo, L. |
|
16:10 - 16:35 |
Large highway tunnels under operating metro lines in the soils of Santiago - design and control approach |
Toledo, M.; Cárcamo, V.; Silva, D. |
|
16:35 - 17:00 |
Melbourne Metro Tunnel Project - novel design and construction approach for major station caverns |
Lagger, H.; Sainsbury, D.; Sainsbury, B.-A.; Storry, R. |
|
|
|
||
17:00 |
Closing words |
Univ.-Prof. Dipl.-Ing. Dr.-Ing. Thomas Marcher
Institute of Rock Mechanics and Tunnelling
Graz University of Technology
Rechbauerstraße 12, A-8010 Graz
Univ.-Prof. Dipl.-Ing. Dr.mont. Robert Galler
Chair of Subsurface Engineering
Montanuniversität Leoben
Erzherzog-Johann-Straße 3/III, A-8700 Leoben
Ines Metzler MSc
Institute of Rock Mechanics and Tunnelling
Graz University of Technology
Rechbauerstraße 12, A-8010 Graz
Tel.: +43 316 / 873 4229
Email: tunnel @tugraz.at
Web: www.tugraz.at/events/atcc/home